Oceaneering International Web Site - 2010

Prof. Robert B. Laughlin
Department of Physics
Stanford University, Stanford, CA 94305

http://www.oceaneering.com/1670/2-piece-cylinder-design-uta-in-use
(Copied 20 Jan 10)

(Click for Oceaneering Main Page)

2-Piece Cylinder Design UTA in Use

September 2, 2009

Fit testing UTA prior to mudmat completion during manufacturing in Houston, TX. Photo: Oceaneering.

Oceaneering International, Inc. has designed, manufactured and installed a custom Umbilical Termination Assembly (UTA) design that fits through a 1.3-meter tensioner for offshore applications. The new UTA design features hydraulic and electrical connections configured into a 2-piece frame. The design allows the two assemblies to be separated during termination work.

Lead times during manufacturing are reduced since assembly and fabrication processes can be performed in parallel instead of series. The UTA is deployed separately from the mudmat, offering more flexibility than the older design.

For further information on the custom UTA or other specialized subsea equipment, contact Mike Hearn or Darwin Hyatt:
Email: mhearn@oceaneering.com; or dhyatt@oceaneering.com
Phones:
Michael Hearn: 832.467.7116
Darwin Hyatt: 832.467.7839